Completed Projects
• Borg Warner – Ford Turbo EPC, GM Turbo GP-12, Turbo shaft & wheel, Turbo weld verification,
Ford Gen 2 fan drive, Molded fan CS2, Numerous Tier 2+ supplier related sorts/rework, labor
support where needed to run production, FAI for each production order in Fan department.
• Linamar MR – BMW shock tower CS2 (e-coat & casting issues), Volvo shock tower, Tremec trans
casting, VW engine block casting (inspection & repair), MRB support, Ford CCB EPC, Honda CCB
EPC, Ford Ladder Frame, BMW shock tower @ PEWAG CS1, Warehouse inspect and repair, labor
support to run VW press while inspecting product, Tier 2+ supplier related sorts/rework.
• Prince MFG – Shiloh/Cosma Casting BMW shock tower C2, Constellium motor beam EPC at
launch, GFLinamar BMW shock tower EPC, Constellium motor beam CS2 a year after EPC
completion (e-coat and sub straight related issues), Constellium motor beam various repair/clean
sorting prior to e-coat, labor support to run e-coat line, Tier 2+ supplier related sorts/rework.
• Linamar NC – Ford transmission gear EPC (G1, G3, G5 gears), VW engine block inspection and
repair, Tremec, ZF gears, Tier 2+ supplier related sorts/rework.
• Duncha USA – Ford pinion ring gear EPC.
• Raumedic – Bottle and Cap assembly – Rework
